skip to main
|
skip to sidebar
Green Tango Pavilion East
Monday, November 10, 2008
Little Drawings
Throughout this project little drawings have been popping up on the drywall (assuming one of the subs is documenting the progress as well).
This one showed up soon after the GC returned to the site after a few days away.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Twitter Updates
follow me on Twitter
Pavilion East Links
Green Tango
Green Tango Application
Green Tango Blog
Green Tango Franchise
The Splinter Group
Blog Archive
►
2009
(1)
►
January
(1)
▼
2008
(92)
►
December
(13)
▼
November
(16)
Day 2 of the Corian
Polishing Corian
That's a straight line
Blocks!
First Cabinet
Taking Photos of Photos
You always forget something
Green Tango Application for Employment
Paint
Menu Boards
Floor Preperations
Timbre
Little Drawings
Here Comes the FRP (Fiberglass Reinforced Plastic)
Progress through Puzzles
Drywall
►
October
(10)
►
September
(15)
►
August
(15)
►
July
(8)
►
June
(6)
►
May
(7)
►
April
(2)
About Me
Billy Maupin
View my complete profile
ShareThis
No comments:
Post a Comment